    This is the story, with pictures, of the upgrading of the Briefing Hut with a new roof and the addition of a permanent roof on the Engine Test Stand Port, et al, as recorded in the following album.

    Roof Prep
    The new roof finally arrived (about 3 hrs. after promised) via a delivery pickup and was laid out in the parking lot. (10/20/05)
    New Roof with crew
    The roof and crew preparing to attach the clamps and blocks to the edge and the pull ropes to the clamps.  The five pull ropes can be seen in place over the existing roof.

    Crew members included (l-r) Vern Skovgaard,  Marv  Hollander,  Bob Foster, Dan Cook, George  Frazier.  Not shown, Olaf Gniechwitz,  Joe Cook

    New Cover - West
    The new roof has  been pulled from west to east over the top of the existing roof and  tie down anchor rods and boards installed along the bottom.  The door is yet to be cut out. (10/21/05)
    New  Cover - South
    View of new roof from the south end.  Note the degree of overlap with the old roof.  We expect it to gradually stretch and shift to match.

    New Cover - East
    Veiw of the new roof from the east with the door opening cut out.
    New Roof - North
    View of the new roof from the north.  We set up this end so it just matched the level of overlap of the old roof.

    Westside New Cover w/ Door
    West side view after the doorway was cut into the fabric. (10/22/05)
    Tie Downs
    Tie down  detail.  (10/22/05)

    West side tie downs
    Tie downs on the west side.
    East side tie downs
    Tie downs on the east side

    Trial fit
    Another re-roof project.  The fabric covered Engine Test Stand Port is being re-roofed with a permanent corrugated fiberglass material.  This is a trial fit of a panel to see how it will sit with the envisioned attach blocks. (10/20/05)
    Roof attach detail
    Shot of the roof atttach blocks.

    Rafter Progress 1
    Rafters on - front
    Rafter Progress 2
    Rafters on - 3/4 front

    Rear studs 1 - front
    Rear studs 1 - front
    Rear studs 1 - rear
    Rear studs 1 - rear

    Rear studs complete - front
    Rear studs complete - front
    Rear studs complete - rear
    Rear studs complete - rear

    Roof half on and Dan Cook - Front
    Roof half on and Dan Cook -
    front
    Rear panels and west half of roof - rear
    Rear panels and west half
    of roof on - rear

    Roof Complete - rear SW 3/4
    Roof Complete - rear SW 3/4
    Roof Complete - rear SE 3/4
    Roof Complete and east
    wall in place - rear SE 3/4

    Finished - SW corner view
    Finished  - SW corner view
    Finished - SE corner view
    Finished - SE corner view

    <